Tomball Facilities Study Process.

Below you will find a basic flowchart of what will happen over the next few months. I have also included to the right, what we can do at each step to make our case for a new high school.


Attend the subcommittee meetings and actively participate. Educate yourself on all sides of the issue and decide what you believe would be best for the school district.


Attend the Public forum and voice your opinion for or against the Steering Committees recomendations.





Make your feelings known to the members of the school board before March 6th.

If you are in agreement with the bond vote for, if not, decide if we can afford to defeat the bond, knowing that overcrowding will be a huge problem at the elementary schools.

Keep in mind, when this bond goes to election, we cannot say "Yes, build the elementary schools but not the 9th grade campus". There will be two boxes, yes or no.

Bottom line is we need to engage the supporters of the 9th grade campus and the "undecided" voters. We need to educate them on our proposal and convince them that if the New High School goes to bond, it is an affordable and viable solution for Tomball ISD. If we do not, the bond election could fail.

Moving Forward...

What is best for Tomball ISD... that is the real question we need to answer, isn't it. I think there are people on both sides of the issue that have lost sight of that common goal.

Each resident of Tomball ISD who has an interest in our future, needs to do what I did. Make time to sit down and spend an hour or two going through the key data and facts. Throw out the conjecture and emotional pleas, just take a look at each proposal, the data behind them and make a decision that YOU are comfortable with.

So much attention has been focused on the argument about the 9th Grade Campus or New High School, that we never talk much about the real problem in this school district and that is the over crowding of the elementary schools and in the very near future the intermediate schools.

In the next two years we will have 4 out of 5 Elementary schools above their operational capacity. Lakewood Elementary, where my kids go to school, will have 264 kids more then they have classrooms for. If we pass a bond election in May of 2007, the first school will not open until the 2009-10 school year.

That is why the decision about a new 9th Grade Campus or New High School is so important. If we cannot decide as a district what is best, then the bond will fail. If the bond fails, the education of our elementary students will suffer due to over crowding.

By drawing a line along 2920 and saying you are either with us or against us, as many supporters of both sides have done, you are just setting both sides up for failure. By polarizing the issue and alienating the other side it makes it more difficult for each side to find a common ground.

I support a new high school in the south part of the district. I have been through the data provided by Tomball ISD and I believe the Tomball High School has reached its capacity. That is my opinion, it is not a fact and it is not the only opinion. There are people the believe the 9th grade campus would be best for TISD. My opinion is no more “right” then theirs.

I hope this committees proposal includes a new high school. If it does, I hope all the bridges that have been burned over the last few weeks can be repaired before the bond election. Because if they are not repaired, the bond will fail.

Presentations from last week

Here are the links to the two presentations that were made at the meeting last week.

Pro High School Presentation....

Pro 9th Grade Presentation...

Agenda for October 3rd Meeting

AGENDA
Student Growth/Instructional Facilities Sub-Committee
Facility Study Committee

Date: October 3, 2006
Time: 7:00 PM
Place: Tomball Intermediate School Auditorium
723 West Main, Tomball, TX 77375
The auditorium is a separate building located near the southwest corner
of the school on Vernon Street south of Main.

1. Additional factual presentations by Pro Second High School and Pro Ninth
Grade Campus supporters. PLEASE NOTE THAT THIS WILL BE
ADDITIONAL PRESENTATION OF FACTUAL INFORMATION ONLY WITH
REFERENCE INDICATION FOR ALL INFORMATION PRESENTED.

2. Vote for support of Second High School or Ninth Grade Campus options.

3. Discussion concerning K-6 facilities in The Woodlands area

4. Preliminary development of facility need/construction flow charts

Wednesday, September 27, 2006

How Do I Get Involved?

GET INVOLVED WITH THE FUTURE OF TISD

When: Tuesday October 3rd, 2006
7:00 p.m. sharp (arrive at 6:45 p.m.)
Tomball Intermediate Auditorium (located on FM 2920)
Every Sub-Committee Member will be able to cast their vote

How do I become a Sub-Committee Member and what are my duties?

  • Attend a meeting
  • Sign Roster
  • Fill out sub-committee form (form can be filled out at meeting)

Stay informed by attending meetings whenever possible and/or reviewing minutes on the website


Tuesday October 3rd, a vote will be taken by all sub-committee members for either a 9th grade campus or a second high school along with other campus decisions. The results of this vote will be used to make recommendations to the Steering Committee.

This is a vote to determine what recommendations will be made to the Steering Committee. This recommendation will then be reviewed and potentially change by the Sterring Committee, then submitted to the School Board. The School Board will review and potentially change the final proposal which will then go to a Bond Election. This is the FIRST step in a long process.

Get involved NOW and STAY involved!!!

Your involvement is critical.
Educational decisions are being made and your voice needs to be heard.
Tuesday September 26th, 2006 was a sub-committee meeting where pro 9th grade and pro high school supporters presented.
The minutes from this meeting and all the sub-committee member meetings are posted on the websites below. All websites are listed to keep you informed.

http://www.paradigmconsultants.com/content.asp?secnum=182
http://tomballisd.blogspot.com/
http://tomballisd.net/ (click on Facility Study lower left corner)

Upcoming Meetings

Tuesday October 3, 2006 7:00 PM TIS Auditorium
Tuesday October 10, 2006 7:30 PM TIS Auditorium
Tuesday October 17, 2006 7:00 PM TIS Auditorium
Tuesday October 24, 2006 7:00 PM Bus Barn
Wednesday November 1, 2006 7:00 PM Bus Barn
Wednesday November 8, 2006 7:00 PM Bus Barn

Comments from Mayor Harrington

Comments from Mayor Harrington

Monday, September 18, 2006

Meeting Minutes - Sept. 12th

MEETING MINUTES
September 12, 2006
Student Growth/Instructional Facilities Sub-Committee
Facility Study Committee
Tomball Independent School District
Chairman: Brent Lapsley
Co-Chairman: Rocky Fischer
Co-secretaries: SueAnne Wake and Anne Miesen
Facilitators: Dr. Darlene Blair and Huey Kinchen

1. Carrie Pearson will present material next week concerning school size refined to school
districts with size similar to Tomball ISD.
2. Kathy Matt presented current information regarding the new Creekside Park development
in The Woodlands. The projections provided by The Woodlands were identical to those
previously presented by Mr. Scheulke. The communication from the developer did state
that the only homes currently under construction are custom homes, which are very large
and will take about a year to build. Actual enrollment numbers were also presented from
two K-6 elementary schools in the Conroe ISD which cover another part of the
development. Deretchin School opened in the Fall 2005 with fewer than 300 children.
The current enrollment is now at 787. The other school opened in the Fall 2002. The
current enrollment is at 1,115.
3. SueAnne Wake presented information regarding 9th grade only schools. There are many
advantages and disadvantages. Location is a vital consideration in having a 9th grade
only campus. If it is not in close proximity to the high school then the 9th grade students
do not have access to extra-curricular activities. The number of times a student
transitions should also be a consideration. A discussion followed regarding pros and
cons on a 9th grade only campus.
4. Brent Lapsley will talk to Mayor Harrington regarding Tomball ISD’s history of utilizing
a 9th grade only campus. Ronnie Lambert will talk with Klein ISD administrators
regarding the Klein’s history of 9th grade only campus.
5. Questions were raised about the cost of building the different types of schools. Mr.
Lapsley will get this information.
6. The response from Mr. Schuelke regarding existing plans and estimated time to finalize
design, bid and build the various schools was discussed. This document can be found on
the website.
7. Population maps for 2005 and 2010 were presented by David Zuhlke and Rocky Fischer.
These maps can be found on the website. The numbers were close to the numbers
presented by Mr. Schuelke. The percentage of growth in the west and north-west part of
the district is estimated to have the greatest population increase. The south end of the
district and the east side of the district are the areas with the next biggest increase.
8. The committee is in agreement that two elementary schools will need to be built. For the
next meeting, the committee should be ready to discuss locations for these schools,
discuss the option of building a K-6 campus in The Woodlands and the initial boundaries
(zones).
9. Mr. Lapsley will request current enrollment numbers of all schools by grade levels.

Update on New High School

The Sub-Committee seems to be divided into two camps, one is pushing for a 9th grade campus and the other for a new High School.

A 9th grade campus will allow us to continue with only one High School for a few more years, but we are going to eventually need to build another High School. It looks like a 9th grade campus could extend the life of the current HS until about 2013. The problem with that is we would be maxed out at the HS and the 9th grade campus and there would not be any other options.

If we do not build a new HS during this process, we would not be able to have a new HS until the year 2015 at the earliest and probably closer to 2016 or 2017.

A new HS would provide adequate facilities well into the future, probably to the 2020-21 school year.

We are having another meeting Wednesday September 20th, at 7:00pm. If you have an opinion on the future of the Tomball ISD, please try and attend.

Also, if you would like to add any information to this Blog, email me at tyoung66@gmail.com

All the information that has been covered at the meetings can be found here.

Monday, August 21, 2006

Student Growth/Instructional Facilities Sub-Committee
Facility Study Committee
Tomball Independent School District

August 15, 2006

Chairman: Brent Lapsley
Co-Chairman: Rocky Fischer
Co-secretaries: SueAnne Wake and Anne Miesen
Facilitators: Dr. Darlene Blair and Huey Kinchen

The meeting was a joint meeting of all three Facility Study subcommittees in the Tomball High School Auditorium. Meeting minutes were taken by Anne Miesen.

1. All meeting attendees received a copy of 26 page enrollment analysis and growth projections, which was reviewed in detail by David Schuelke, Assistant Superintendent for Ancillary Services.

2. Tomball H.S. maximum capacity has gone from 3,000 to 3,702 since last bond election. Facility is being used in different ways, portables, building additions, etc. However, the revised operational capacity for THS (and the figure this subcommittee should use) is 3,628.

3. A map of the school district, marked with current subdivisions was included in the information packet.

4. A Metro Study was also included with potential future subdivision developments, including The Woodlands. The Woodlands development could include over 4,900 homes. Developments outside The Woodlands, but in TISD, that are in concept stage number 2,188.

5. Assume a factor of .95 school age children per household.

6. Bottom line: Projections vs. capacity analysis five years out (2010-2011) indicate:

Without Woodlands Development
THS 85.01%
TJH 72.8%
Intermediate 93.3%
Elementary 118.5%

With Woodlands
THS 103.78%
TJH 89.92%
Intermediate 116.22%
Elementary 146.13%

Tuesday, August 15, 2006

Minutes from first Meeting

Student Growth/Instructional Facilities Sub-Committee
Facility Study Committee
Tomball Independent School District
August 7, 2006

Chairman: Brent Lapsley
Co-Chairman: Rocky Fischer
Co-secretaries: SueAnne Wake and Anne Miesen
Facilitators: Dr. Darlene Blair and Huey Kinchen

The meeting was conducted by Brent Lapsley. Meeting minutes were taken by SueAnne Wake.

1. The schedule for meetings was presented. Most meetings will be held on Tuesday evenings. Two meetings were changed to Wednesday (August 23 and August 30) due to orientation meetings at the elementary schools Meetings are expected to be held either at the Bus Barn or at the high school auditorium. Locations for meetings are tentative and will be confirmed in the individual meeting agendas. A final schedule will be sent to all committee members.

2. The next meeting, scheduled for Tuesday, August 15 at 7:30 PM, will include the three sub-committees. It will take place in the high school auditorium where growth projections will be presented by David Schuelke, Assistant Superintendent for Ancillary Services.

3. The committee decided that email is the preferred way to communicate subcommittee business.

4. Given the large size of the sub-committee, it is possible that smaller groups may be formed to explore specific matters of interest.

5. A question was raised as to the origins of the growth projections. Mr. Lapsley stated that it was his understanding that the school district had contracted with an independent consultant for this information. An additional question related to whether all new housing developments have been incorporated into current projection figures.

6. The primary focus of the sub-committee is the growth of the district. To this end, the sub-committee will examine, among other factors, location of schools, attendance zones, consideration of state-mandated programs and requirements and size of classrooms.

7. A sub-committee member suggested that the Tomball Chamber of Commerce and the Texas Department of Transportation have websites containing growth projections within the district.

8. A request was made for maps of the school district, to include all new housing developments. Mr. Lapsley stated that this information would be provided in future meetings.

9. The minutes and agendas will be provided to all committee members via email. A suggestion was made to establish a website for the committee. Mr. Lapsley and Mr. Kinchen agreed to explore the possibility of placing sub-committee materials on a website. Magda Craige volunteered to assist in creating and/or maintaining the website. This issue will be discussed at further meetings.

10. The committee was reminded that all meetings will be open to the public.

New Facilities Planned Meetings

Meeting Schedule
Student Growth/Instructional Facilities Sub-Committee
Facility Study Committee
Tomball Independent School District


Day Date Time Location

Monday August 7, 2006 7:00 PM THS Auditorium

Tuesday August 15, 2006 7:30 PM THS Auditorium

Wednesday August 23, 2006 7:00 PM Bus Barn

Wednesday August 30, 2006 7:00 PM TIS Auditorium

Tuesday September 5, 2006 7:00 PM Bus Barn

Tuesday September 12, 2006 7:30 PM Bus Barn

Wednesday September 20, 2006 7:00 PM Bus Barn

Tuesday September 26, 2006 7:00 PM Bus Barn

Tuesday October 3, 2006 7:00 PM TIS Auditorium

Tuesday October 10, 2006 7:30 PM TIS Auditorium

Tuesday October 17, 2006 7:00 PM TIS Auditorium

Tuesday October 24, 2006 7:00 PM Bus Barn

Wednesday November 1, 2006 7:00 PM Bus Barn

Wednesday November 8, 2006 7:00 PM Bus Barn

Creation of Sub-Committees

We met last week to create the sub-committees that will be studying the Facilities. There are three sub-committees, one will look at existing facilities, one at finances and the other at the need for new facilities. I signed up for the New Facilities Subcommittee.

I will continue to post information on the sub-committee activities throughout the process. If you have any questions, please let me know. I will post the schedule of meetings, so feel free to attend, they are all open to the public.

Friday, April 07, 2006

Contribute to this Blog to help get the word out...

Please take the time to add comments to the articles I have posted or if you have information you would like added, please send me an e-mail via the link on the right. The more people we can get involved in the process, the more likely we are to come to a solution that is best for everyone in Tomball ISD.

April 4th Tomball ISD Meeting at Lakewood

I attended the April 4th meeting at Lakewood Elementary school to discuss Tomball ISD's upcoming Facility Study Process. This is the first such meeting that I have attended and was surprised at the level of tension in the meeting from the very beginning.

Some of the anger voiced at the meeting involved Tomball ISD's failure to begin this process earlier. Superintendent Neubauer indicated that the goal was to undergo a Facility study every 5 years and it has been 7 years since the last study was done. The Board members indicated that they didn't feel the District was growing fast enough to warrant the study, so they delayed the process until this year. While I do not have any kids in Tomball High School, every indication is that THS is over crowded already and will continue to worsen until the issue is addressed.

I think the end result of this study will be a big group of really smart people getting together and saying..."Hey, I think we need a new High School". The problem with the timing is that any new High School will not open until January 2010 at the earliest. Given a modest 3% increase in attendance over the next few years, that puts the 2009-10 enrollment right at 3000 kids. This will certainly have Tomball High School pushed to its max. That being said, this is the situation we have to deal with, so lets move forward and try and do what is right to make sure that our kids get the best education possible.

Of course, one of the main questions everyone is wondering about is where this new High School will be built, if approved. Once again, I think rumors and misinformation have led everyone to believe that all of this has already been decided, but it hasn't. I have my opinion and I am sure you do as well, but the most logical choice would be to put the new High School in the southern part of the District. I think it would be difficult for anyone without a preset agenda would come to any other conclussion. After the new construction of Northpointe Intermediate School and Willow Wood Junior High in the Southern part of the District, the logical next step is to build the High School in the area as well.

Tomball ISD Facility Study Timeline

Facility Study 2006-2007
Timeline


March 7,2006 Board of Trutees approval of the Facilities Study andTimeline

May 9,2006 Board of Trustees appoints Steering Committee; Charge to Committee and parameters identified

July 24,2006 1st Steering Committee meeting

August 7,2006 Organization and 1 St meeting of Subcommittees

Aug 7-Nov 16 Subcommittees conduct research and develop recommendations to Steering Committee

Nov 16,2006 Subcommittees report recommendations to Steering Committee

December 5,2006 Steering Committee conducts Public Forum

January 9,2007 Steering Committee makes recommendation to Board

Jan 9-Mar 5,2007 Board evaluates recommendations and develops proposal

If indicated:
March 6, 2007 Board calls for Bond Election

April 25,2007 Early voting begins

May 12,2007 Bond Election Day

Tomball ISD Facility Study Process

Here is the text of the document handed out at the April 4th meeting at Lakewood Elementary:

Facility Study Process
2006-2007

The Board of Trustees of the Tomball Independent School District has commissioned a study to be conducted by members of the Tomball Independent School District communityto assess the needs for facilities improvements and expansion for the years 2006-2007through 2010-201 1. A group of prospective participants will be selected by the T.I.S.D.Board of Trustees to form a core of committee members. This core group of members willmeet to organize, divide into subcommittees and solicit other interested people. Additionalparticipants will be solicited via the media and notices sent out to each parent in the district.A meeting will then be held for all interested participants to organize and divide intosubcommittees.


The group will organize themselves into three subcommittees under an overallsteering committee

  • Student Growth and Instructional Facilities Subcommittee
  • Educational Adequacy of Existing/Support Subcommittee
  • Financing Facilities for Student and Program Growth Subcommittee


These subcommittees will study such topics as demographics of the area, populationprojections, programs of other school districts, the district's current financial position andmethods of financing capital expenditures. They may visit campuses, interview teachersand administrators, and do independent research on current quality levels of programs,instruction, and finance in the public education field. Each subcommittee will report ontheir findings and make recommendations to the Steering Committee. The SteeringCommittee will analyze the reports and develop their findings and recommendations.


The findings and recommendations of the Steering Committee will be presented at apublic forum, with the purpose of explaining the process for and conclusions of their studyand soliciting response from the public. The Steering Committee will then present theirfindings and recommendations to the TISD Board of Trustees.


The Board will make a determination, based upon the report of the SteeringCommittee, of the facility needs of the district for the next 5 years and the means to addressthese needs. If a bond election is indicated, the Board will develop the bond proposal andcall the election.

Thursday, April 06, 2006

Welcome

Thanks for taking the time to check out my Blog. I attended a meeting at Lakewood Elementary school on Tuesday, March 4th to discuss Tomball ISD and future sites for new schools in the district.

The most important thing I learned at the meeting was that there is a lot of miss-information out there. As mentioned at the meeting, there are a lot of rumors or "bus-stop" talk about what has already happened or will happen regarding future facilities and mainly a new high school in Tomball.

For this reason, I have decided to start a blog to put out the information I have on this process. I plan to actively participate in this process and will update this blog with any and all information I get along the way. Please check back when possible for updates.